Strefa przemysłowa miasta Tangshi, Gaobu, prowincja Dongguan, Prowincja Guangdong, Chiny
Dom ProduktyMaszyna z pianki poliuretanowej

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit

  • Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit
  • Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit
Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit
Szczegóły Produktu:
Place of Origin: Dongguan China
Nazwa handlowa: ZHMACH
Orzecznictwo: CE Certificate
Model Number: ZHF-2017A
Zapłata:
Minimum Order Quantity: one set
Cena: inquiry
Packaging Details: To be pack in paper with plastic film and wooden case water proof packing
Delivery Time: 45 days
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Kontakt
Szczegółowy opis produktu
Wymiar całkowity: 35m * 4,5m * 3,2m Wysokość produktu: Maks. 1300mm
Maksymalna pojemność: 200 ~ 300 l/min Obszar zastosowań: gąbka, pianka poliuretanowa, materac, meble
szerokość produktu: 1200 mm ~ 2300 mm (regulowany) Pojemność: 2000mm/min~7000mm/min
Model pieniący: Pełna automatyka Surowiec: PPG, TDI, MC, A33, T9, olej silikonowy, H2O, pigment, itp
RSsystem: System ciągnięcia RS z folią z tworzywa sztucznego Transporter: Do przenośnika z długim arkuszem pianki 50m
High Light:

maszyna do spieniania poliuretanu

,

sprzęt do pianki poliuretanowej

,

maszyna do ciągłej pianki poliuretanowej

 

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit

 

This Foam Production Line is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming.

 

Main technique specification:

 

1, Dimension:Total length 40m×Total width 4m×Total Height 3m

 

2, Foaming material Group: 13 groups, man-machine interface, both manual and computerized control.

 

3, Foaming width: 980mm~2350mm

 

4, Foaming height: Max 1300mm

 

5, Foaming density: 8Kg/m³~100kg/m³

 

6, Foaming speed: 2000r/min~7000r/min

 

7, Max total output:300kg/min

 

8, Material spraying way:

 

① The way of down sprayer head (upper, down, front, back can be adjusted)

② The way of trough overflow pipe.

 

9, Controlling way of foaming:

 

①PLC controlling, can continuously foaming two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by control box.

④Oven side links width can be adjusted by control box.

 

10, Mixing –head motor: 37kw

 

11, Total power: About 90kw

 

 

Transducer Types

 

Model Power/kw

Use

 

Qty Brand
FC360 37

Mixing head

 

1 Danfoss
FC-051P 7.5

PPG+CaCo3

 

1 Danfoss
FC-051P 5.5

PPG

 

1 Danfoss
FC-051P 4

TDI

 

1 Danfoss
FC-051P 2.2

MC , Flame retardant

 

2 Danfoss
FC-051P 1.5

Black

 

1 Danfoss
FC-051P 0.75 Water, Ann, Si, Tin, Color A/B Anti-yellow 7 Danfoss
FC-051P 0.75

Spray head

 

1 Danfoss
FC-051P 5.5/3.7/1.5 Oven inner conveyer line,side conveyer line, cutting machine 3 Danfoss
FC-051P 7.5

Conveyor belt

 

1 Danfoss

 

 

Pump of loding material

 

Model

Specification

 

Use Qty/set Brand
KCB-83.3

200L/min

 

PPG Loding 1 China
CB-13

200 L/min

 

PPG+CaCo3 loding 1 China
NB-63

120 L/min

 

TDI loding 1 Shanghai
NB-32

30 L/min

 

MC loding 1 Shanghai
KCB-55 25 L/min Flame retardant loding 1 China

 

 

Techniques and After-sale Services:

 

1,Buyer should assist seller to undertake the testing. Both seller and buyer should be responsible for the on-site testing of the production line. The testing is mainly for three formulas including high, medium and low density.

 

2,During the testing, If the raw material waste is caused by seller’s technical problems or the quality of the production line (i.e. foam collapse, burnings, or machine malfunction), the additional portion of the raw materials that over 2 tons are on seller’s account. The problems not related to seller’s are on buyer’s account.

 

3,During installation, seller will send technicians to buyer’s place of business. Buyer should arrange his staffs to assist the technicians with the installation, and prepare water, electricity and place for installation.

 

4,The machines are in simple packing.

 

5,During installation and testing, buyer is responsible for the food, Visa fee, turn-round flight tickets and accommodation for the technicians sent by seller. Buyer also should pay $40/day/person as the allowance for the technicians sent by the seller.

 

6,The machines are under one year warranty (in the circumstance of normal use). Natural damage, non-professional demolition, maintenance errors are not within the scope of warranty.

 

7,After warranty period, seller will provide paid service for machine maintenance.

 

 

Payment Terms:

 

After signing of the contract, buyer pays as the advance payment 30% of total price , when seller gets the deposit, the contract takes into effect; the balance of 70%will be paid by buyer before shipment.

 

 

 

 

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit 0

 

 

Horizontal Continuous Polyurethane Foam Machine with Clamp Long Foam Block Unit 1

Szczegóły kontaktu
Dongguan Zehui machinery equipment co., ltd

Osoba kontaktowa: Wang

Tel: 0086-15817646348

Wyślij zapytanie bezpośrednio do nas (0 / 3000)

Inne produkty