Strefa przemysłowa miasta Tangshi, Gaobu, prowincja Dongguan, Prowincja Guangdong, Chiny
Dom ProduktyLinia produkcyjna gąbek

Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress

Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress

  • Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
  • Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
Szczegóły Produktu:
Place of Origin: Guangdong, China (Mainland)
Nazwa handlowa: ZHMACH
Orzecznictwo: CE
Model Number: ZHF-2017
Zapłata:
Minimum Order Quantity: one set
Cena: inquiry
Packaging Details: foam machine Automatic continously foam making machine nude packing together with some paper and plastic film and foam sheet some small spare parts in wooden box one standard machine need 1*20GP 2*40HQ
Delivery Time: 45days after receive downpayment
Payment Terms: Western Union, L/C, T/T
Supply Ability: two sets per month
Kontakt
Szczegółowy opis produktu
Rodzaj produktu: Automatyczna maszyna do ciągłego wytwarzania piany tryb sterowania: Automatyczne sterowanie PLC
Napięcie: 380V/50HZ lub dostosowane falownik: Siemens / Delta / Danfoss
pompa maszynowa: AMERYKAŃSKA POMPA WIKINGÓW / JAPOŃSKA Krajalnica do bloków piankowych: Synchroniczne cięcie podczas spieniania
System R.S: System ciągnięcia R.S. z folią z tworzywa sztucznego płyta upadku: Automatyczna regulacja 7 sekcji
Formuła pianki: automatyczne zapisywanie ponad 200 zestawów Całkowita produkcja: 100-300kg/min
High Light:

maszyny do produkcji pianki pu

,

maszyna do produkcji gąbek

,

linia do produkcji gąbek 300 kg / min

 

Polystyrene Horizontal Flexible Foam Production Line for Mattress and Pillow
 
Specification


The Foam making machine is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming. 

 
Main specification

 

 Oven Length 18m
 Foam Height 1.0-1.25m
 Foam Width 1.0-2.25m
 foam desity 8-200kg/m³
 total power 130KW
 inner coveyer length 18m
 side board adjustable width 0.98-2.3m
 conveyer belt speed 0-8m/min
 fall plate seven section adjustable
 total output 100-300kg/min
 machine dimension L35× W4.2 ×H3.2m
 

Main technique specification:
 

Dimension

Total length 35m×Total width 4m×Total Height 3m

Foaming material Group 13 groups, man-machine interface, both manual and automatically computer control
Foaming width

980mm~2250mm

Foaming height

Max 1200mm

Foaming density

8Kg/m³~100kg/m³

Foaming speed

2000r/min~7000r/min

Max total output

300kg/min

Material spraying way ① The way of down sprayer head (upper, down, front, back can be adjusted)             ② the way of trough overflow pipe.
Controlling way of foaming

① PLC controlling, can continuously foaming two different formulas in one time
② All inverter controlling foaming and work in phase with the production line
③ Oven declining board height and width can be adjusted by control box.
④ Oven side links width can be adjusted by control box

Mixing –head motor

37kw

Total power

About 90kw

 

How is the packing of the machine?
 
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
 
How many container will be needed for the whole set of machine?
 
For the standard 13 groups of Automatic continous foam machine Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
We will try the best way to pack all the machine well and also save the freight cost.

 
FAQ:

 
Q: How many days for the install and testing of the machine?
 
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
 
Q: For the cost of the engineer how much I need to pay?
 
A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
 
Q:What kind of raw material tools we need to prepare for the testing?
 
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
 
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
 
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
 
Q:During the foaming if we have some problems abt the foam and the machine how can we do ?
 
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
 
Q: During the using of the products if we find some problem how can we slove?
 
A: You can just help to check in the operation manual and the video first if can’t work just call our after sale service.
 
Q: How many spare parts for you to give us?
 
A: We will send you all the necessary spare parts that free of charge together with the machine. After that you need to buy.

 
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress 0
 

Szczegóły kontaktu
Dongguan Zehui machinery equipment co., ltd

Osoba kontaktowa: Wang

Tel: 0086-15817646348

Wyślij zapytanie bezpośrednio do nas (0 / 3000)

Inne produkty