Strefa przemysłowa miasta Tangshi, Gaobu, prowincja Dongguan, Prowincja Guangdong, Chiny
Dom ProduktyMaszyna do klejenia pianek

EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦

EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦

  • EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦
  • EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦
  • EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦
EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦
Szczegóły Produktu:
Place of Origin: Guangdong China (Mainland)
Nazwa handlowa: ZHMACH
Orzecznictwo: CE Certificate
Model Number: ZHTH-1830/2100
Zapłata:
Minimum Order Quantity: one set
Cena: Inquiry
Packaging Details: Paper and Film, Wooden case
Delivery Time: 30 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: one set per month
Kontakt
Szczegółowy opis produktu
Szybkość wiązania: 0 ~ 40 mm Moc rury grzewczej: 34kw
Całkowita moc silnika: 5.5KW Wymiary urządzenia: L8000 * W2400 * H2570mm
Służy do wiązania niektórych materiałów: takich jak PVC i pianka, PVC i włóknina, pianka i tekstylia Regulacja mocy: Bezstopniowa regulacja prędkości AC (narzędzie do dystrybucji)
Temperaturę ogrzewania można zmienić od: 30◦ do 200◦ Mogę dodać: funkcja kształtu tłoczenia
High Light:

foam measure machine

,

foam sheet bonding machine

 

Foam Bonding Machine to Bind Some Materials the heating temperature can be changed from 30◦ to 200◦

 

  • Used to bind some materials, such as PVC and foam,PVC and non-woven fabric,foam and textile
  • The heating temperature can be changed from 30◦ to 200◦
  • Can add the embossing shape function

This binding machine is mainly used to bind some materials,such as PVC and foam,PVC and non-woven fabric, foam and textile with glue,the heating temperature can be changed from 30◦ to 200◦ , it can add the embossing shape function.

 

model

ZHTH-1830

ZHTH-2100
Binding speed 0~40mm

0~40mm

Heating tube power

34kw 34kw

Motor total power

5.5kw 5.5kw

Device dimensions

L8000 * W2400 * H2300mm L8000 * W2400 * H2570mm
Power control Ac variable frequency stepless speed regulation (distribution tool)

Ac variable frequency stepless speed regulation (distribution tool)

 

Marks:

1. According to seller's standard designed drawing diagrame to arrange the production and inspection.

2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer.

3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shippment (The bank charge for buyer's account).

4. Delivery forms: Send to ShenZhen Seaport

5. Spare parts: Offer assorted maintain tools.

6. Package: paper & film package.

7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%)

8. Delivery date: 45 days (after seller get the advance).

9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account.

 

FAQ

 

Q: How many days for the install and testing of the machine?


A: After all the machine in your factory we will send 1 engineer help to install the machine you must send someone to help about 2 days installation will finished and the machine can be running.


Q: For the cost of the engineer how much I need to pay?


A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.


Q:What kind of raw material tools we need to prepare for the testing?


A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.


Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.


Q:During the foaming if we have some problems abt the foam and the machine how can we do?

A: You can just call our after sale manager explain for the situation or send some pictures we will help to handle within 24hours.

EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦ 0

 

EPE / PE Foam Bonding Machine With Changed Heating Temperature 30◦ To 200◦ 1

Szczegóły kontaktu
Dongguan Zehui machinery equipment co., ltd

Osoba kontaktowa: Wang

Tel: 0086-15817646348

Wyślij zapytanie bezpośrednio do nas (0 / 3000)

Inne produkty