Strefa przemysłowa miasta Tangshi, Gaobu, prowincja Dongguan, Prowincja Guangdong, Chiny
Dom ProduktyLinia produkcyjna gąbek

PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture

PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture

PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
video
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
Szczegóły Produktu:
Place of Origin: Guangdong China (Mainland)
Nazwa handlowa: ZHMACH
Orzecznictwo: CE Certificate
Model Number: ZHF-2017-7
Zapłata:
Minimum Order Quantity: one set
Cena: inquiry
Packaging Details: Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ.
Delivery Time: 45 days
Payment Terms: Western Union, T/T, L/C
Supply Ability: two sets per month
Kontakt
Szczegółowy opis produktu
Waga: 20 ton Wymiar (dł. * szer. * wys.): dł.5430xszer.4650xwys.2590mm
Zapewniona obsługa posprzedażna: Inżynierowie dostępni do obsługi maszyn za granicą Moc (w): 43kw
Model pieniący: Półautomatyczny formuła: automatyczne zapisywanie receptur
Gwarancja: Rok falownik: Siemens / Delta / Danfoss
Chemiczny: PPG, TDI, MC, silikon + H2O, T9, A33 itp. Lakierki: US. NAS. Viking/ Chinese/ Japanese Wikingowie/Chińczycy/Japończycy
High Light:

maszyny do produkcji pianki pu

,

linia do produkcji materacy piankowych

,

linia do produkcji gąbek do materacy piankowych

 

Semi-Auto Polyurethane Sponge Production Line For Foaming Mattress and Furniture

 

Company Information

 

Zehui Foaming Machinery Technology Co.,Ltd is the foam machine factory established in 2008 manufacture the automatic continuous foaming machine line and some relevant foam cutting machines.

Our main products ZHF-2017 Foam Production Line can make the foam for furniture industrial shoes industrial and so on.

 

ZHF-2017-7 Semi-Auto Foam Making Machine

 

Main technique specification:

 

1, Dimension:L2.8 m×W1.5m×H2.5m

2, Foam mould size(can be adjusted): W1500-2000×L2000-3000×H1200 two sets

3, Foaming material Group: 7 groups, man-machine interface control

4, Foaming height: Max 1200mm

5, Foaming density: 8Kg/m³~100kg/m³

6, Foaming speed: 2000r/min~7000r/min

7, Max total output:230L/time

8, Mixing –head motor: 11kw

9, Total power: About 43 kw

 

Main collocates and material chooses:

 

Material pot types: (The work pressure in the pot is normal pressure)

 

Type Use

Specification

Qty
Big material tank PPG+mixture material 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
Big material tank TDI 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1

 

Big material tank MC

1m³/δ2mm stainless steel

1
Small material tank Si,T9,A33,Color 80L/δ1mm stainless steel 4

 

Transducer Types

 

Model Power/kw

Use

Qty Brand
VFD-B 11

Mixing head

1 Delta
VFD-B 5.5

PPG

1 Delta
VFD-B 3.7

TDI

1 Delta
VFD-B 2.2

MC

1 Delta
VFD-B 1.5 Si,T9,A33,Color

4

Delta
 

Motor types:

 
Model Power/kw

Use

Qty Brand
Y200L-2 11

Mixing head

1 Guangdong
Y132S-4 Horizontal 7.5

PPG

1 Guangdong
Y132S-4 Horizontal 3.7

TDI

1 Guangdong
Y100-4 Horizontal 2.2

MC

 

1 Guangdong
Y100-6 Horizontal 1.5

Ann, Si, Tin, Color,

4 Guangdong
Y100-4 Vertical 2.2

PPG material mixing

 

1 Guangdong
Y100-4 Vertical 1.5

TDI Mixing

1 Guangdong
Y100-4 Horizontal 2.2

PPG mixing

1 Guangdong
Y100-4 Horizontal 2.2

TDI filing

1 Guangdong

 

Our Services

 

We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.

 

FAQ

 

Q: How many days for the install and testing of the machine?

 

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

 

Q: For the cost of the engineer how much I need to pay?

 

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

 

Q:What kind of raw material tools we need to prepare for the testing?

 

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

 

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

 

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

 

Q:During the foaming if we have some problems abt the foam and the machine how can we do?

 

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

 
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture 0
 

 

Szczegóły kontaktu
Dongguan Zehui machinery equipment co., ltd

Osoba kontaktowa: Wang

Tel: 0086-15817646348

Wyślij zapytanie bezpośrednio do nas (0 / 3000)

Inne produkty