Strefa przemysłowa miasta Tangshi, Gaobu, prowincja Dongguan, Prowincja Guangdong, Chiny
Dom ProduktyLinia do produkcji pianki

Semi - Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture

Semi - Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture

    • Semi - Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture
    • Semi - Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture
  • Semi - Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture

    Szczegóły Produktu:

    Place of Origin: Guangdong China (Mainland)
    Nazwa handlowa: ZHMACH
    Orzecznictwo: CE Certificate
    Model Number: ZHF-2017-7

    Zapłata:

    Minimum Order Quantity: one set
    Cena: inquiry
    Packaging Details: Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ.
    Delivery Time: 45 days
    Payment Terms: Western Union, T/T, L/C
    Supply Ability: two sets per month
    Skontaktuj się teraz
    Szczegółowy opis produktu
    Weight: 20 tons Dimension(L*W*H): L5430xW4650xH2590mm
    After-sales Service Provided: Engineers available to service machinery overseas Power(W): 43kw
    Foaming Model: Semi-automatic formular: auto save the formulations
    Warranty: one year Inverter: Siemens/ Delta /Danfoss
    Chemical: PPG, TDI, MC, Silicone+H2O, T9, A33, Etc. Pumps: US. Viking/ Chinese/ Japanese

     

    Semi -Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture

     

    Company Information

     

    Zehui Foaming Machinery Technology Co.,Ltd is the foam machine factory established in 2008 manufacture the automatic continuous foaming machine line and some relevant foam cutting machines.

    Our main products ZHF-2017 Foam Production Line can make the foam for furniture industrial shoes industrial and so on.

     

    ZHF-2017-7 Semi-Auto Foam Making Machine

     

    Main technique specification:

     

    1, Dimension:L2.8 m×W1.5m×H2.5m

    2, Foam mould size(can be adjusted): W1500-2000×L2000-3000×H1200 two sets

    3, Foaming material Group: 7 groups, man-machine interface control

    4, Foaming height: Max 1200mm

    5, Foaming density: 8Kg/m³~100kg/m³

    6, Foaming speed: 2000r/min~7000r/min

    7, Max total output:230L/time

    8, Mixing –head motor: 11kw

    9, Total power: About 43 kw

     

    Main collocates and material chooses:

     

    Material pot types: (The work pressure in the pot is normal pressure)

     

    Type Use

    Specification

    Qty
    Big material tank PPG+mixture material 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system 1
    Big material tank TDI 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

    1

     

    Big material tank MC

    1m³/δ2mm stainless steel

    1
    Small material tank Si,T9,A33,Color 80L/δ1mm stainless steel 4

     

    Transducer Types

     

    Model Power/kw

    Use

    Qty Brand
    VFD-B 11

    Mixing head

    1 Delta
    VFD-B 5.5

    PPG

    1 Delta
    VFD-B 3.7

    TDI

    1 Delta
    VFD-B 2.2

    MC

    1 Delta
    VFD-B 1.5 Si,T9,A33,Color

    4

    Delta
     

    Motor types:

     
    Model Power/kw

    Use

    Qty Brand
    Y200L-2 11

    Mixing head

    1 Guangdong
    Y132S-4 Horizontal 7.5

    PPG

    1 Guangdong
    Y132S-4 Horizontal 3.7

    TDI

    1 Guangdong
    Y100-4 Horizontal 2.2

    MC

    1 Guangdong
    Y100-6 Horizontal 1.5

    Ann, Si, Tin, Color,

    4 Guangdong
    Y100-4 Vertical 2.2

    PPG material mixing

    1 Guangdong
    Y100-4 Vertical 1.5

    TDI Mixing

    1 Guangdong
    Y100-4 Horizontal 2.2

    PPG mixing

    1 Guangdong
    Y100-4 Horizontal 2.2

    TDI filing

    1 Guangdong

     

    Our Services

     

    We will help to design the layout of the machine that put in your factory.

     

    We will send 2-4 experience engineers to install and testing the machines.

     

    We will teach your engineer how to operate the machine and how to maintain the machines.

     

    We will give you the machine operation manual and the best formulation for target products that you are going to make.

     

    FAQ

     

    Q: How many days for the install and testing of the machine?

     

    A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

     

    Q: For the cost of the engineer how much I need to pay?

     

    A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

     

    Q:What kind of raw material tools we need to prepare for the testing?

     

    A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

     

    Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

     

    A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

     

    Q:During the foaming if we have some problems abt the foam and the machine how can we do?

     

    A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

     

    Semi - Auto Polyurethane Foam Production Line For Foaming Mattress and Furniture
     
     
     
     

    Szczegóły kontaktu
    Dongguan Zehui machinery equipment co., ltd

    Osoba kontaktowa: Sales Manager

    Wyślij zapytanie bezpośrednio do nas (0 / 3000)

    Inne produkty