Strefa przemysłowa miasta Tangshi, Gaobu, prowincja Dongguan, Prowincja Guangdong, Chiny | bella@zehuimach.com |
Place of Origin: | Guangdong China (Mainland) |
Nazwa handlowa: | ZHMACH |
Orzecznictwo: | CE Certificate |
Model Number: | ZFP-2017 |
Minimum Order Quantity: | one set |
---|---|
Cena: | inquiry |
Packaging Details: | Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ. |
Delivery Time: | 45 days |
Supply Ability: | One set per month |
Rodzaj produktu: | Elastyczna maszyna do produkcji pianki | Wymiar (dł. * szer. * wys.): | 3400*4550*4200mm |
---|---|---|---|
Zapewniona obsługa posprzedażna: | Inżynierowie dostępni do obsługi maszyn za granicą | Pływ: | Szklany przepływomierz sprawdza przepływ |
rodzaj pianki: | Spryskać i koryto | Kontrola: | automatyczny sterownik PLC z ekranem dotykowym |
Szerokość pienienia: | 980mm ~ 2350mm | Gęstość pienienia: | 8 kg/m3 ~ 100 kg/m3 |
falownik: | Siemens / Delta / Danfoss | System: | System ściągania RS z plastikiem |
High Light: | sprzęt do produkcji pianki,linia do produkcji płyt z pianki pcv,maszyny do produkcji materacy 100 kg / m3 |
Automatic Memory Polyurethane sponge Production Line with Siemens inverter
[Specifications]
Dimension | L33M×W4M×H3M |
Foaming width | 980mm~2250mm |
Foaming height | Under 1200mm |
Foaming density | 8kg/m3~100kg/m3 |
Foaming speed | 2000rpm~7000rpm |
(1)The whole machine parts specifications:
1. Foaming control Platform(standard) L3m×W2.52m×H0.7m
2. Oven declining board (standard) L9m×W0.98m~2.30m
3. Oven side links(standard) L18m×W2.3m×H1.2m
4. Oven machine frame(standard) L18m ×W4m×H3m
5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )
Motor | Guangdong brand |
Pump | Viking pump & Chinese pump |
Invertor | Siemens brand |
PLC | Siemens |
Temperature | Control system |
Gear pump types:
Model | Specification |
Use material
|
Qty/set | Brand |
K124A | 200L/min |
PPG
|
1 | Viking Pump |
K124A | 200L/min |
POP
|
1 | Viking Pump |
L32 | 300L/min |
CaCo3
|
1 | Viking Pump |
NB-80 | 120L/min |
TDI
|
1 | Shanghai |
NB-32 | 30L/min |
MC
|
1 | Shanghai |
NB-25 | 25L/min |
Flame retardant
|
1 | Shanghai |
GPY-6 | 6L/min |
Si
|
1 | Japan |
GPY-5.8 | 6L/min |
A-33
|
1 | Japan |
GPY-5.8 | 6L/min |
T9
|
1 | Japan |
GPY-11.5 | 8 L/min |
H2O
|
1 | Japan |
GPY-12 | 8 L/min |
Colour1
|
1 | Japan |
GPY-12 | 8 L/min |
Anti-yellow
|
1 | Japan |
GPY-12 | 8 L/min |
Black color
|
1 | Japan |
Remark:The above only for reference. All the data is subjected to sold products.
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.
How many container will be needed for the whole set of machine?
Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.
We will try the best way to pack all the machine well and also save the freight cost.
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.
You are warmly welcome come and visit our factory.
Osoba kontaktowa: Wang
Tel: 0086-15817646348
Maszyna do produkcji pianki PE 130KW, torby EPE do produkcji pianek
EPE Foam Making Machine, niskociśnieniowa pianka poliuretanowa z inwertorem Siemens
W pełni automatyczne maszyny do produkcji materacy, przemysłowa maszyna piankowa do sof / obuwia
Automatic Memory Polyurethane Sponge Production Line With Siemens Inverter
Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
PE Foam Sheet / Sponge Production Line For Foaming Mattress And Furniture
Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
Auto Sponge Circle Horizontal Foam Cutting Machine / CNC Foam Cutter Machine
Przemysłowy pionowy nóż do pianki do materaca gąbkowego, maszyna do cięcia Cnc Eps
Rail Type Foam Block Foam Sheet Cutting Machine Horizontal PLC Control
Hydrauliczna maszyna do cięcia pianki poliuretanowej do automatycznego sterowania arkuszem gąbki